KSEB Connected Load Regularisation 2026|Last Date :31 March 2026|KSEB

Are you using more electrical appliances now than when you first obtained your electricity connection? If the answer is yes, you need to take steps to increase your Connected Load.

KSEB has introduced a golden opportunity for customers by simplifying the existing procedures for increasing connected load. This opportunity is available only until March 31, 2026.
Key Benefits & Details:
 * Fee Waivers: Application fees, testing fees, and additional security deposits have been waived.
 * Costs: Customers only need to pay if the requested additional load or a change in voltage level requires modifications to the physical distribution network.


 * Eligibility: All categories of LT (Low Tension) consumers can utilize this scheme.
 * Legal Note: In cases where there are existing objections from legal authorities, load regularization will only be permitted after the dispute is resolved.
How to Apply:
 * Online: Registered users can apply through the KSEB website at wss.kseb.in.
 * Offline: You can submit a completed application form along with a copy of your ID proof and a declaration regarding the connected load at your respective Electrical Section Office.
This is a cost-effective opportunity for all consumers to update their records without submitting extensive documentation.
Make use of this golden opportunity and avoid future legal proceedings.

KSEB Over Head Connection Charges|KSEB Connection with Post|KSEB

In this article, let's create a basic idea about KSEB ECSC (Estimate Cost for Service Connection ) rates.You have to pay CD(Cash Deposit )rates, in addition with this, GST and Flood Cess are not applicable for CD.

Case1

If the consumer needs  a Weather  Proof Support (WPS)i.e, a bare post without  (Now 8 meter  PSC poles are provided ), crossarms and insulators. 
Then 
ECSC=₹5540
CGST(9%)+SGST(9%)=₹997.2
You have to add normal(WP) charges with  this.
1.₹2054 (Single  Phase )
2.₹4980(There  Phase )
So Total ECSC=5540+997.2+2054=₹8592.
(Single  Phase ). 
This  will applicable in all the following cases.


Case  2

If the consumer has to construct a single phase 2 wire line with length less than 50 meters. 
Here the basic  ECSC rate=₹9160
In addition to this ₹80 per meter. 
Suppose the length of OH line =40 meters 
Then total cost is calculated as follows :
9160+80*40=₹12360
GST(SGST(9%)+CGST(9%)-18%=₹2224.8
Total =₹14585

(One post with one stay)
Also, if the way of line is not straight, an additional post is needed, then  it's treated as post insertion in single phase line.
The basic rates as follows, you have to pay GST(18%) in addition to the amount shown here.
Pole insertion with  stay-₹8170.

Pole insertion without stay-₹6700.

Case 3

If the consumer has to construct a single phase 2 wire line with length more  than 50 meters and less than 100 meters, with two posts.
Here the basic  ECSC rate=₹21950
In addition to this ₹80 per meter for length  above 50 meters . 
Suppose the length of OH line =90 meters 
Then total cost is calculated as follows :
21950+80*40=₹25150
GST(SGST(9%)+CGST(9%)-18%=₹4527
Total =₹29677

The following are some common services in OH connection and their basic rates as per KSEB Cost Data, you have to pay GST(18%) in addition to the amount shown here.You can calculate charges for any type of construction, but the amount may differ due to changes in material estimate.
1.Pole insertion  in single phase line with sturt-₹13850.
2.Pole insertion in three phase line with stay -₹9200.
3.Pole insertion in three phase line without stay -₹7730.
To know more  Click  Here

KSEB Three Phase Connection Charges |Single Phase to Three Phase Conversion|KSEB

If your existing  connected load is greater than 5kw, 3 phase conversion is a must. 
Let us see the step by step procedure of KSEB  Single Phase  to Three Phase Conversion.
First  of all, the wiring should altered  for a 3 phase  service  connection. In this regard a 3 phase  DB(Distribution Box) is needed. 
After completion  you need to apply for this along with the following documents. 
2.Identity  Proof
3.Test report/Completion  Certificate from a licensed electrical  contractor. 
4.Sketch  showing the connected  equipments.
5.General  Test Report (for office use )

In this time, Application fee of ₹89 has to be remitted.
After field  verification, You will get a demand  note  including CD(Cash Deposit ) ECSC  (Estimate  Cost  for  Service  Connection ).
Normally CD is ₹300 per kw for a domestic connection(₹1000 for most  of the other  purposes ).You have to pay only  the additional amount required as CD.
Suppose, your  new load is 8750 watts  and your existing CD (otherwise  called Security  Deposit )is ₹2100.So you have to pay ₹600 only.
ECSC is as follows :-
1.Below  10 kW

₹4170+₹375(CGST )+₹375(SGST )=₹4920

2.Above 10 kW and below 25 kw 

₹15450+₹1391(CGST )+₹1391(SGST )=₹18231

If you need  OH line  Construction  or conversion the  basic  rates  as follows. GST(18%)  extra. 
1.Construction  of L T 3 Phase  4 wire  line-₹460/meter. 
2.Conversion  of LT Single  Phase  2 wire  line to LT 3 Phase  4wire  line-₹165/meter. 

After  fee remittance, your  5-30 Ameter is replaced by a10-60A meter. This should not  change your  consumer number, change only  your phase.