KSEB Over Head Connection Charges|KSEB Connection with Post|KSEB

In this article, let's create a basic idea about KSEB ECSC (Estimate Cost for Service Connection ) rates.You have to pay CD(Cash Deposit )rates, in addition with this, GST and Flood Cess are not applicable for CD.

Case1

If the consumer needs  a Weather  Proof Support (WPS)i.e, a bare post without  (Now 8 meter  PSC poles are provided ), crossarms and insulators. 
Then 
ECSC=₹5540
CGST(9%)+SGST(9%)=₹997.2
You have to add normal(WP) charges with  this.
1.₹2054 (Single  Phase )
2.₹4980(There  Phase )
So Total ECSC=5540+997.2+2054=₹8592.
(Single  Phase ). 
This  will applicable in all the following cases.


Case  2

If the consumer has to construct a single phase 2 wire line with length less than 50 meters. 
Here the basic  ECSC rate=₹9160
In addition to this ₹80 per meter. 
Suppose the length of OH line =40 meters 
Then total cost is calculated as follows :
9160+80*40=₹12360
GST(SGST(9%)+CGST(9%)-18%=₹2224.8
Total =₹14585

(One post with one stay)
Also, if the way of line is not straight, an additional post is needed, then  it's treated as post insertion in single phase line.
The basic rates as follows, you have to pay GST(18%) in addition to the amount shown here.
Pole insertion with  stay-₹8170.

Pole insertion without stay-₹6700.

Case 3

If the consumer has to construct a single phase 2 wire line with length more  than 50 meters and less than 100 meters, with two posts.
Here the basic  ECSC rate=₹21950
In addition to this ₹80 per meter for length  above 50 meters . 
Suppose the length of OH line =90 meters 
Then total cost is calculated as follows :
21950+80*40=₹25150
GST(SGST(9%)+CGST(9%)-18%=₹4527
Total =₹29677

The following are some common services in OH connection and their basic rates as per KSEB Cost Data, you have to pay GST(18%) in addition to the amount shown here.You can calculate charges for any type of construction, but the amount may differ due to changes in material estimate.
1.Pole insertion  in single phase line with sturt-₹13850.
2.Pole insertion in three phase line with stay -₹9200.
3.Pole insertion in three phase line without stay -₹7730.
To know more  Click  Here

KSEB Three Phase Connection Charges |Single Phase to Three Phase Conversion|KSEB

If your existing  connected load is greater than 5kw, 3 phase conversion is a must. 
Let us see the step by step procedure of KSEB  Single Phase  to Three Phase Conversion.
First  of all, the wiring should altered  for a 3 phase  service  connection. In this regard a 3 phase  DB(Distribution Box) is needed. 
After completion  you need to apply for this along with the following documents. 
2.Identity  Proof
3.Test report/Completion  Certificate from a licensed electrical  contractor. 
4.Sketch  showing the connected  equipments.
5.General  Test Report (for office use )

In this time, Application fee of ₹89 has to be remitted.
After field  verification, You will get a demand  note  including CD(Cash Deposit ) ECSC  (Estimate  Cost  for  Service  Connection ).
Normally CD is ₹300 per kw for a domestic connection(₹1000 for most  of the other  purposes ).You have to pay only  the additional amount required as CD.
Suppose, your  new load is 8750 watts  and your existing CD (otherwise  called Security  Deposit )is ₹2100.So you have to pay ₹600 only.
ECSC is as follows :-
1.Below  10 kW

₹4170+₹375(CGST )+₹375(SGST )=₹4920

2.Above 10 kW and below 25 kw 

₹15450+₹1391(CGST )+₹1391(SGST )=₹18231

If you need  OH line  Construction  or conversion the  basic  rates  as follows. GST(18%)  extra. 
1.Construction  of L T 3 Phase  4 wire  line-₹460/meter. 
2.Conversion  of LT Single  Phase  2 wire  line to LT 3 Phase  4wire  line-₹165/meter. 

After  fee remittance, your  5-30 Ameter is replaced by a10-60A meter. This should not  change your  consumer number, change only  your phase. 







KSEB Meter Shifting ,Tariff Change and Load Change |Application Form |Step by Step Process


Let us see what is the step by step procedure of  Load Change ,Tariff Change and Meter Shifting in KSEB . An application regarding a service connection e.g. revising connected load, phase conversion, tariff change, billing disputes etc. will normally be processed only if the registered consumer is the applicant.Also , ensure thatall the electrical installations  are done by a licensed Electrical Contractor. 

1.Meter Shifting ,Tariff Change and Load Change
If you are re-build your house or complex(for Construction Purpose)you have to apply for these three.Also after the completion of works you need to  do the procedures once again.
At first you must make the  arrangements  to shift the meter to a safe place with the help of a licensed contractor .In this regard, proper Earthing and Protection of Metering Equipment and other Saftety measures like E.L.C.B/R.C.C.B  are very essential.
For the Tariff change ,the consumer premises must the requirements of proposed Tariff.
The load calculation should match with the existing installations.Incorrect  load may lead to penal bills later.
Application Forms
Supporting Documets
1.Identity Proof
2.Test Report/Completion Certificate.
3.Sketch of Installation.
After submitting the Application ,your details are verified by a field staff.
Fees and ACD(Including GST(18%).
1.Application Fee-Rs.58/-
2.Meter Shifting Fee-Rs.720/-(Single Phase)

3.ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other)
The Forms can be used for single  purposes and Consumer  can fill the application based on their needs.The difference in fees is as follows.
Ø  Tariff Change and Load Change
1.Application Fee-Rs.58/-
2 ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other).
Ø  Meter Shifting
1.Application Fee-Rs.41/-
2.Meter Shifting Fee-Rs.720/-
Ø  Load Change
1.Application Fee-Rs.58/-
2 ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other).

Ø Tariff Change
1.Application Fee-Rs.41/-
Some Common Tariff and Purposes.
LT-1A-Domestic
LT-4A-Industrial/Drinking Water Projects.
LT-7A-Commercial
LT-7B-Commercial(Small Shop/Bunk)
LT-6F-Construction/Mobile Towers/Un-aided Schools
LT-6A-Mosque/Temple/Church.
LT-6D-Govt,  Aided School.
LT-6G-Medical Lab
LT-5B-Farms
LT-5A-Agriculture
LT-6C-Bank
LT-10- Electric Charging Stations(New)

How to Get a New Service Connection From KSEB? |KSEB Service Connection|KSEB

New service connection application shall be made either online or in prescribed Service Connection Application Form; the same application form can be used for obtaining permanent / temporary service connection.
Green Channel for HT/ EHT Consumers

Simplified Service Connection application forms are available at a cost of Rs 10/- at Electrical Sections.You can Download the same from KSEB website.
The applicants for weatherproof service connection not requiring phase addition, post-insertion, support post etc can remit security deposit and cost of effecting supply at standard rates along with the application fee, on the basis of the data furnished in the application form. In case of other consumers, intimation to remit Security Deposit and cost will be given through mail after site inspection.
Duly filled application form along with accompaniments and requisite application fee can be handed over to authorised KSEB official at Electrical section Office or forwarded through registered post to Assistant Engineer of the concerned Electrical Section.
Documents to accompany Application Form for Service Connection.
The following documents shall be produced along with application. Please refer to Supply Code 2014 for more details.
1.Proof of Identity (Photo Identity Card).
2.Proof of Ownership
3.Sketch showing details of connected equipments, marked in building plan.
4. Letter of authorization, if applicable
5. Consent from owner, if applicable

6. Test Certificate of metering equipment, if consumer supplies the same.
7.Certificate for claiming exemption from payment of cost for providing service connection, if applicable.
8.Consents / Authorisations / Approvals wherever applicable.
9.Service Connection Agreement, if applicable.
In short, for a domestic service connection you need the following along with Application Form.
1.Identity Card(Aadhar,Driving License,Voters ID....or any other photo affixed identity proof) 
2.Passport size photograph.
3.Possession  Certificate From Village Office.(Now Ownership Certificates are not mandatory for domestic service connection,but we need Building Permit From Local bodies for construction purpose) Or Land tax receipt.
4.Sketch showing details of connected equipments, marked in building plan.
5. Test Certificate from a licensed electrical contractor. .
6.Service Connection Agreement.
7.Document of ELCB/RCCB installed.
8.Copy of Permanent Work Register.
After Getting an Application Number
  • Make  the payment of application fee(now Rs.60/),Overseer or Sub Engineer(for agricultural or industrial connection)will inspect your premises and verify the details you shown in the application.
  • The they will prepare an estimate for your connection and that will include CD (Cash Deposit) and OYEC(Own Your Electrical Connection)/ECSC(Estimate Cost for Service Connection.
  • Normally CD is Rs.300/- per kW(0-1000W=1kW,1001-2000w=2kW and so on).For other connection for 1W-Rs.1/-.
  •  
  • ECSC=Rs.1740+157(SGST)+157(CGST)=Rs.2054/-
  • If you need additional post or support post you have to pay the material and labour  cost of  it.
  • After making all the payments,you will get a new service connection and a Consumer Number will assign to you.
  • All the above steps may be completed within a week.
For  Malayalam

KSEB Post Shifting Charges|Application,Fee,Procedures,|KSEB

     In this article, let's create a basic idea about KSEB Post Shifting Charges.In addition with basic material and labour cost, 16% Material SOC and 10 % Supervision Charges are need to be paid,Also  GST (18%) is applicable. 

1.First you need to submit a written request to concerned Assistant Engineer.

2.Then you  have to pay required fee(Application and Processing Fees) under the service"Realignment of Existing Service Wire/Post "or "Realignment of Existing Service Wire/Post-HT "   

Fee:-

LT-Rs.354/-

HT-Rs.1180/-

 3.With in a week assigned person will visit your premises and prepare an Estimate and Sketch of the required shifting ,if possible.

4.Then you will be notified regarding the Estimate Cost.

5.After fee payment,the work will carried out by External Agencies. 

Here,we discuss about the Shifting of a LT Pole and Line .

The task required are:-

1.Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.-Rs.1280/-

2.Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling-Rs.312/-

3. Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.-Rs.247.60/-(.05km)

4. Erecting one LT PSC Pole in position incl. digging &
back filling pit.-Rs.1342/-

5. Providing Stay for LT poles incl. digging & back filling pit.-Rs.625/-

6. Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.-Rs.507.47/-(.045km)

Total Labour charge-Rs.4314.07/-

Super vision Charge10%-Rs.431.41/-

GST(18%)-Rs.854.13/-

Total Estimate Cost-Rs.5602/-

 

 

 

 

 

 

 

 


                                     

How to Change Ownership in KSEB?|KSEB Ownership Change Application Form,Fee,Procedures|KSEB

At first
    In case of transfer of rights or ownership of property, consumers are advised to transfer the ownership of the electric connection to new owner, in order to safeguard their interests. An application regarding a service connection e.g. revising connected load, phase conversion, tariff change, billing disputes etc. will normally be processed only if the registered consumer is the applicant. It may be borne in mind that registered consumer will be held responsible for the omissions and commissions by the transferee.


Application for registering change of ownership shall be preferred in Service Connection Application Form, after clearing entire arrears of electricity charges with up-to-date surcharge, interest etc.
Applicant has to remit Application Fee of Rs 10/- and processing fee of Rs 100/-. Applicant needs to produce:
Consent from the previous owner for transferring ownership of the service connection along with the security deposit, to the new owner.

If the applicant is unable to produce consent, he shall execute a bond in non-judicial stamp paper worth Rs 200/- agreeing to indemnify the Board from any loss, damage and cost of litigation, which the Board might incur on account of transferring the ownership and an undertaking to the effect that he shall remit the amount of security deposit at the time of transfer of ownership along with interest accrued on the same thereafter, if the previous consumer raise a claim on the security deposit at a later date.
New ownership certificate issued by local self-government authorities.
Service Connection agreement (LT consumers need only affix court fee stamp worth Rs 200/- in the service connection application form, other consumers has to execute agreement in Kerala non-judicial stamp paper worth Rs 200/-).
New completion report, if there is change of connected load.
The adequacy of security will be reviewed and new consumer may have to make good shortfall, if any.

Now as per ease of doing business, 

All the dues has to be cleared before submitting application for name/ownership change.(vide regulation 91 sub clause 4(b) of supply code 2014.
Consumer can apply online also. 
On successful submission of the online application, the originals of documents shall be kept ready for verification by KSEBL officials,during site inspection. (documents mentioned in the system generated form).
Documents required based on reason for change- 
Legal heir by virtue of death of original consumer  

1.Will
2.Registered instrument 
3.Succession certificate
4.Legal Heirship Certificate 
5.Document certifying revision in municipal or land records .
 
 

Ownership change on others

Any One of these document:-

  1. Ownership certificate of the building issued by Muncipal corporation / Muncipality / Panchayath /Township
  2. Ownership / Possession certificate of the land issued by competent revenue authority
  3. Copy of title deed duly attested by a gazetted officer/KSEB Ltd officer
  4. Copy of land tax payment receipt issued by revenue authorities issued within 1 year(authenticity may be verified with the original)
  5. Valid Rent /Lessor-Lessee Agreement along with any of the documents (listed above) providing ownership of the leaser (applicable in case of service connection application made by the tenant/lessee)
  6. Occupancy certificate from Muncipal Corporation/Muncipality/Panchayath

In support of Security Deposit , Any One of these document:-

  • Consent in plain paper for transfer of ownership from the previous owner
  • Indemnity bond
None(Security Deposit to be paid afresh)





Proof of Identity , Any One of these document:-
  • Electoral ID card
  • Passport
  • Driving License
  • Ration Card
  • Photo identity Card issued by any Government Department or agency or PSU
  • PAN Card
  • Aadhar Card.
  • Photo Identity Certificate from village Panchayat or Municipality or Municipal Corporation.


 
 In short,
There are two types of Ownership Change.
1.Application for Change of Name-in case of Sale/ Lease / Change in ownership / Occupancy – not for legal heirs.
2.Application for Change of Name-For transfer of ownership to Legal Heir.



Also ,if there is a change in your Connected Load use the following Test Report from a Licensed Electrical Contractor.

The Application fee to be remitted is Rs.159/-(Incl GST ).Rs.190/-(For 3 Phase Connection)
Also you have to pay ACD (Additional Cash Deposit)if there is a change in load.
After field verification the Ownership should get transferred to New owner.