If your existing connected load is greater than 5kw, 3 phase conversion is a must.
Let us see the step by step procedure of KSEB Single Phase to Three Phase Conversion.First of all, the wiring should altered for a 3 phase service connection. In this regard a 3 phase DB(Distribution Box) is needed.
After completion you need to apply for this along with the following documents.
2.Identity Proof
3.Test report/Completion Certificate from a licensed electrical contractor.
4.Sketch showing the connected equipments.
5.General Test Report (for office use )
In this time, Application fee of ₹89 has to be remitted.
After field verification, You will get a demand note including CD(Cash Deposit ) ECSC (Estimate Cost for Service Connection ).
Normally CD is ₹300 per kw for a domestic connection(₹1000 for most of the other purposes ).You have to pay only the additional amount required as CD.
Suppose, your new load is 8750 watts and your existing CD (otherwise called Security Deposit )is ₹2100.So you have to pay ₹600 only.
ECSC is as follows :-
1.Below 10 kW
₹4170+₹375(CGST )+₹375(SGST )=₹4920
2.Above 10 kW and below 25 kw
₹15450+₹1391(CGST )+₹1391(SGST )=₹18231
If you need OH line Construction or conversion the basic rates as follows. GST(18%) extra.
1.Construction of L T 3 Phase 4 wire line-₹460/meter.
2.Conversion of LT Single Phase 2 wire line to LT 3 Phase 4wire line-₹165/meter.
After fee remittance, your 5-30 Ameter is replaced by a10-60A meter. This should not change your consumer number, change only your phase.