KSEB Meter Shifting ,Tariff Change and Load Change |Application Form |Step by Step Process
How to Get a New Service Connection From KSEB? |KSEB Service Connection|KSEB
Simplified Service Connection application forms are available at a cost of Rs 10/- at Electrical Sections.You can Download the same from KSEB website.
- Make the payment of application fee(now Rs.60/),Overseer or Sub Engineer(for agricultural or industrial connection)will inspect your premises and verify the details you shown in the application.
- The they will prepare an estimate for your connection and that will include CD (Cash Deposit) and OYEC(Own Your Electrical Connection)/ECSC(Estimate Cost for Service Connection.
- Normally CD is Rs.300/- per kW(0-1000W=1kW,1001-2000w=2kW and so on).For other connection for 1W-Rs.1/-.
- ECSC=Rs.1740+157(SGST)+157(CGST)=Rs.2054/-
- If you need additional post or support post you have to pay the material and labour cost of it.
- After making all the payments,you will get a new service connection and a Consumer Number will assign to you.
- All the above steps may be completed within a week.
KSEB Post Shifting Charges|Application,Fee,Procedures,|KSEB
In this article, let's create a basic idea about KSEB Post Shifting Charges.In addition with basic material and labour cost, 16% Material SOC and 10 % Supervision Charges are need to be paid,Also GST (18%) is applicable.
1.First you need to submit a written request to concerned Assistant Engineer.
2.Then you have to pay required fee(Application and Processing Fees) under the service"Realignment of Existing Service Wire/Post "or "Realignment of Existing Service Wire/Post-HT "
Fee:-
LT-Rs.354/-
HT-Rs.1180/-
3.With in a week assigned person will visit your premises and prepare an Estimate and Sketch of the required shifting ,if possible.
4.Then you will be notified regarding the Estimate Cost.
5.After fee payment,the work will carried out by External Agencies.
Here,we discuss about the Shifting of a LT Pole and Line .
The task required are:-
1.Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.-Rs.1280/-
2.Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling-Rs.312/-
3. Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.-Rs.247.60/-(.05km)
4. Erecting one LT PSC Pole in position incl. digging &
back filling pit.-Rs.1342/-
5. Providing Stay for LT poles incl. digging & back filling pit.-Rs.625/-
6. Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.-Rs.507.47/-(.045km)
Total Labour charge-Rs.4314.07/-
Super vision Charge10%-Rs.431.41/-
GST(18%)-Rs.854.13/-
Total Estimate
Cost-Rs.5602/-