KSEB Meter Shifting ,Tariff Change and Load Change |Application Form |Step by Step Process


Let us see what is the step by step procedure of  Load Change ,Tariff Change and Meter Shifting in KSEB . An application regarding a service connection e.g. revising connected load, phase conversion, tariff change, billing disputes etc. will normally be processed only if the registered consumer is the applicant.Also , ensure thatall the electrical installations  are done by a licensed Electrical Contractor. 

1.Meter Shifting ,Tariff Change and Load Change
If you are re-build your house or complex(for Construction Purpose)you have to apply for these three.Also after the completion of works you need to  do the procedures once again.
At first you must make the  arrangements  to shift the meter to a safe place with the help of a licensed contractor .In this regard, proper Earthing and Protection of Metering Equipment and other Saftety measures like E.L.C.B/R.C.C.B  are very essential.
For the Tariff change ,the consumer premises must the requirements of proposed Tariff.
The load calculation should match with the existing installations.Incorrect  load may lead to penal bills later.
Application Forms
Supporting Documets
1.Identity Proof
2.Test Report/Completion Certificate.
3.Sketch of Installation.
After submitting the Application ,your details are verified by a field staff.
Fees and ACD(Including GST(18%).
1.Application Fee-Rs.58/-
2.Meter Shifting Fee-Rs.720/-(Single Phase)

3.ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other)
The Forms can be used for single  purposes and Consumer  can fill the application based on their needs.The difference in fees is as follows.
Ø  Tariff Change and Load Change
1.Application Fee-Rs.58/-
2 ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other).
Ø  Meter Shifting
1.Application Fee-Rs.41/-
2.Meter Shifting Fee-Rs.720/-
Ø  Load Change
1.Application Fee-Rs.58/-
2 ACD-Rs.300/- for 1000 Watts (Domestic )and Rs.1000/-(Other).

Ø Tariff Change
1.Application Fee-Rs.41/-
Some Common Tariff and Purposes.
LT-1A-Domestic
LT-4A-Industrial/Drinking Water Projects.
LT-7A-Commercial
LT-7B-Commercial(Small Shop/Bunk)
LT-6F-Construction/Mobile Towers/Un-aided Schools
LT-6A-Mosque/Temple/Church.
LT-6D-Govt,  Aided School.
LT-6G-Medical Lab
LT-5B-Farms
LT-5A-Agriculture
LT-6C-Bank
LT-10- Electric Charging Stations(New)

How to Get a New Service Connection From KSEB? |KSEB Service Connection|KSEB

New service connection application shall be made either online or in prescribed Service Connection Application Form; the same application form can be used for obtaining permanent / temporary service connection.
Green Channel for HT/ EHT Consumers

Simplified Service Connection application forms are available at a cost of Rs 10/- at Electrical Sections.You can Download the same from KSEB website.
The applicants for weatherproof service connection not requiring phase addition, post-insertion, support post etc can remit security deposit and cost of effecting supply at standard rates along with the application fee, on the basis of the data furnished in the application form. In case of other consumers, intimation to remit Security Deposit and cost will be given through mail after site inspection.
Duly filled application form along with accompaniments and requisite application fee can be handed over to authorised KSEB official at Electrical section Office or forwarded through registered post to Assistant Engineer of the concerned Electrical Section.
Documents to accompany Application Form for Service Connection.
The following documents shall be produced along with application. Please refer to Supply Code 2014 for more details.
1.Proof of Identity (Photo Identity Card).
2.Proof of Ownership
3.Sketch showing details of connected equipments, marked in building plan.
4. Letter of authorization, if applicable
5. Consent from owner, if applicable

6. Test Certificate of metering equipment, if consumer supplies the same.
7.Certificate for claiming exemption from payment of cost for providing service connection, if applicable.
8.Consents / Authorisations / Approvals wherever applicable.
9.Service Connection Agreement, if applicable.
In short, for a domestic service connection you need the following along with Application Form.
1.Identity Card(Aadhar,Driving License,Voters ID....or any other photo affixed identity proof) 
2.Passport size photograph.
3.Possession  Certificate From Village Office.(Now Ownership Certificates are not mandatory for domestic service connection,but we need Building Permit From Local bodies for construction purpose) Or Land tax receipt.
4.Sketch showing details of connected equipments, marked in building plan.
5. Test Certificate from a licensed electrical contractor. .
6.Service Connection Agreement.
7.Document of ELCB/RCCB installed.
8.Copy of Permanent Work Register.
After Getting an Application Number
  • Make  the payment of application fee(now Rs.60/),Overseer or Sub Engineer(for agricultural or industrial connection)will inspect your premises and verify the details you shown in the application.
  • The they will prepare an estimate for your connection and that will include CD (Cash Deposit) and OYEC(Own Your Electrical Connection)/ECSC(Estimate Cost for Service Connection.
  • Normally CD is Rs.300/- per kW(0-1000W=1kW,1001-2000w=2kW and so on).For other connection for 1W-Rs.1/-.
  •  
  • ECSC=Rs.1740+157(SGST)+157(CGST)=Rs.2054/-
  • If you need additional post or support post you have to pay the material and labour  cost of  it.
  • After making all the payments,you will get a new service connection and a Consumer Number will assign to you.
  • All the above steps may be completed within a week.
For  Malayalam

KSEB Post Shifting Charges|Application,Fee,Procedures,|KSEB

     In this article, let's create a basic idea about KSEB Post Shifting Charges.In addition with basic material and labour cost, 16% Material SOC and 10 % Supervision Charges are need to be paid,Also  GST (18%) is applicable. 

1.First you need to submit a written request to concerned Assistant Engineer.

2.Then you  have to pay required fee(Application and Processing Fees) under the service"Realignment of Existing Service Wire/Post "or "Realignment of Existing Service Wire/Post-HT "   

Fee:-

LT-Rs.354/-

HT-Rs.1180/-

 3.With in a week assigned person will visit your premises and prepare an Estimate and Sketch of the required shifting ,if possible.

4.Then you will be notified regarding the Estimate Cost.

5.After fee payment,the work will carried out by External Agencies. 

Here,we discuss about the Shifting of a LT Pole and Line .

The task required are:-

1.Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.-Rs.1280/-

2.Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling-Rs.312/-

3. Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.-Rs.247.60/-(.05km)

4. Erecting one LT PSC Pole in position incl. digging &
back filling pit.-Rs.1342/-

5. Providing Stay for LT poles incl. digging & back filling pit.-Rs.625/-

6. Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.-Rs.507.47/-(.045km)

Total Labour charge-Rs.4314.07/-

Super vision Charge10%-Rs.431.41/-

GST(18%)-Rs.854.13/-

Total Estimate Cost-Rs.5602/-